Field work

Install overview

The Freedom Tool is installed through the man way hatch. Vapor and skim lines tie into your existing recovery or tank manifold plan.

What a typical install looks like

  • Install takes about 4 hours
  • No need to shut-in the well.
  • Tie-in: All internal hosing is 316 stainless steel
  • Install in AST tanks takes less than 4 hours.
Freedom Tool floating in tank cutaway